L-705
Impact Resistant Aramid Prepreg
Click For
Page 1
Cure Cycles
  • 90-120 minutes at 250°F (121°C), or
  • 60-90 minutes at 275°F (135°C).
Ballistic Testing
  • The designer and fabricator of the structure shall be responsible for testing each laminate configuration to verify conformance to the ballistic requirements.
  • J.D. Lincoln, Inc. does not imply or represent by the above statements that any ballistic threat may be met with any particular construction.
 

NOTICE:Product data and parameters cited in this publication have been obtained in J.D. Lincoln, Inc. laboratories using the materials under carefully controlled conditions. The information, therefore, is believed to be accurate and correctly stated. Data of this type may be considered to be indicative of representative properties obtainable. J.D. Lincoln, Inc. cannot accept responsibility for the misapplication of these products, nor for their use under uncontrolled conditions. Numerical values resulting from the application of this material are dependant on processing details. It is recommended that the user develop his or her own application techniques and generate data consistent with his or her specific application and process.

 
       
Website Copyright 1996-2008 by J.D. Lincoln Inc.
A Member of the Umeco Plc Group.